DS Smith paper mill replacing the coal-fired boiler with a new biomass boiler 

Details:

  • Project – DS Smith paper mill replacing the coal-fired boiler with a new biomass boiler 
  • Location – Rouen, France
  • Year – 2024
  • Man hours – 14 956 hours
  • Scope – Electrical works. Cable tray installation, power supply cable pulling and termination, motors and other electrical equipment installation and connection.
DS Smith paper mill replacing the coal-fired boiler with a new biomass boiler